According to the Georgian Investment Group – GIG Energy, a medium-sized hydro power station is being developed in the Samegrelo area of Georgia. The HPP has a capacity of 46 MW and will produce 200 million kWh on an annual basis. The LSG Solutions supervisory team is in charge of overseeing the work in partnership with Multiconsult UK. We are privileged to collaborate with Multiconsult, which has over 100 years of experience.

Achieved Milestone

The construction of a 6.6 km long tunnel using TBM (Tunnel Boring Machine) modern technology was one of the most significant milestones achieved during this process.

Scope

Our duty on this project is to oversee the work process within the scope of the OE (Owner’s Engineer). The project is scheduled to be finished in September 2023.

The construction of a 6.6KM tunnel

If you would like to know more about our services or would like to ask a specific question, please reach out to us via e-mail: info@lsg.solutions